The following are the important points to be taken care of during cable Installation, at site :

1- General : The cable should be paid off from the top of the Cable drum, held in the normal position. Sufficient care should be taken to prevent twists; acute bends etc. while laying the Cable

2. Minimum Bending Radius :

  Single Core Multi Core
Cables from 3.3 kV to 11kV 15 D 15 D
Cables of 22 & 33 kV Grade 20 D 15 D
Where D is the overall die of the Cable.

3. Maximum Pulling Tension during Installation :

Cables having Aluminium Conductor 30 N/Sq. mm. Max
Cables having Copper Conductor 50 N/Sq mm. Max

4. Cable Support Spacing : The disposition of cable support and its spacing should be such, as to prevent undue strain or damage to the cable

5. Prevention of Moisture Ingress : Care should be exercised at site during installation to prevent damage to cable coverings and end which may cause the ingress of moisture

6. Tests after Installations : Voltage withstand and Insulation Resistance Tests should be conducted on cables after laying or after joining and terminations. The test method, voltage and duration should be as stipulated in IS: 12 55-1983 for various voltage grades of the cables.

 